Most structures built on the waterfront, within the flood zone, require a pile foundation and most often it is a Timber Pile Foundation. If you have driven by any beach front homes from Westhampton to Montauk, you have driven by several that are built on a timber pile foundation Chesterfield installed.
Our Junttan PM16 pile driving rig enables us to be efficient with just a two-man crew and see increased production, allowing our customers to begin the next phase of construction. In addition to installing the Timber Piles, our experienced team of Dock builders and carpenters can also install both timber and steel girder and bracing systems.
123 W. Shore Rd.
Westport Island, ME 04578